Drummond Island Project
Client: Webster & Garner
Project Type: Bulk Tank Build
About this Project
This is our Drummond Island project for Webster & Garner. This project was especially tricky to coordinate the shipping across the lake of the 45,000-gallon tank, along with working in the rocky soil conditions of the island. This tank is equipped with a separate transport unloading with 3″ piping straight to the tank. We have installed a 3″ Blackmer pump for bobtail loading. The plant is equipped with a nitrogen operated emergency shutdown system.
Latest Projects
Webster & Garner
Drummond Island Project - This tank is equipped with a separate transport unloading with 3" piping straight to the tank. We have installed a 3" Blackmer pump for bobtail loading. The plant is equipped with a nitrogen operated emergency shutdown system.
Quality Energy
Cadillac Terminal Project - There are 10- 30,000-gallon tanks on-site, split into 2-5 tank banks. This facility has a rail side unload set-up that is 260' of 4" welded trunkline and can unload 8 railcars without a switch. It has 2-transport loading sites.
Excel Propane
Excel Propane Project - Installed 2 matching 30,000-gallon "stubby" tanks. This plant is equipped with a separate bulkhead for transport unloading and an extra bulkhead and pad for future pump and bobtail load as well as a pump for cylinder and motor fuel dock.